Prewire Mapping

Detailed low voltage wiring schematics for Orange County builders, architects and remodelers, covering automation, networking, AV and security.

What's Included

Room-by-room wiring diagrams for networking, AV, security, and control
Coordination directly with your builder, architect, or electrician
Conduit and low-voltage box placement planned before drywall
Future-proofing so new technology can be added without opening walls

Frequently Asked Questions

When should prewire happen?

Before drywall goes up. That’s the only point where running cable is simple and inexpensive.

What if my house is already built?

We can still add wiring, though the approach depends on your home’s construction. We’ll walk you through the options.

What cable types do you run during prewire?

Category 6A for networking, RG6 coax where needed, and speaker wire, all labeled and home-run back to a central location so future changes are easy.

Do you coordinate with my general contractor or electrician?

Yes. We work directly with your GC and electrician to schedule prewire at the right point in construction, typically after framing and before drywall.

What happens if I add a room or change the design after prewire?

We build in extra capacity at common trouble spots, and if plans change we can run additional cable as long as walls are still open.

Do you provide as-built wiring documentation?

Yes, every prewire job comes with labeled wiring diagrams so anyone servicing the home later knows exactly what’s behind the walls.